PROJECT GALLERY

AVONA AVENUE |
GLEBE

DURATION – 7 Months

ARCHITECT – The Plan House & Annie Bowen Design

PROJECT DETAILS – Half house renovation with cosmetic changes throughout.

BEN BOYD ROAD |
CREMORNE

DURATION – 8 Weeks

DESIGN – A Cut Above Constructions

PROJECT DETAILS – We re-strutted the roof and removed internal walls to create an expansive space. By removing the existing side entry we were able to frame a bi-fold window for natural lighting and adding the final touch to a beautiful and modern open kitchen setting.

BOURKE STREET |
REDFERN

DURATION – 5 Months

DESIGN – Private Job

PROJECT DETAILS – A Stunning Bedroom, Bathroom, Office and Kitchen Renovation at a warm home in Redfern with an incredible view of Sydney city.

CAREFREE ROAD |
NARRABEEN

DURATION – 7 Months

DESIGN – JD Evans & Company

PROJECT DETAILS – Complete Ground & First Floor Renovation

CHILTERN ROAD |
WILLOUGHBY

COST – $220,000

DURATION – 4 Months

DESIGN – Ian Garrity

PROJECT DETAILS – Once a tight, cluttered and out of date residence, has been transformed into an open living entertainers dream suburban home.

COPELAND ROAD |
BEECROFT

DURATION – 4 Weeks

DESIGN – Outdoor Design

PROJECT DETAILS – A steep block of land with limited access, backing onto beautiful bush land with a creek running through the middle. This area is now perfect for entertaining all year round.

CRAIGTON PLACE |
GLENHAVEN

DURATION – 3 Months

ARCHITECT – Eco Design

PROJECT DETAILS – Outdoor entertainment area including  Ground Floor & First Floor Deck, Outdoor Kitchen and Outdoor Spa

CRESCENT STREET |
FAIRLIGHT

DURATION – 8 Months

ARCHITECT – Structure Building Design & Kirsten Clarke Designs

PROJECT DETAILS – Semi-attached Dwelling, Ground Floor Renovation and Extension with a First Floor Addition and Landscaping

ESSEX STREET |
EPPING


DURATION – 4 Weeks

ARCHITECT – A Cut Above Constructions

PROJECT DETAILS – This outdoor living area was designed in-house by A Cut Above Constructions to raise the usability and look of the yard to match the high quality finishes in the interior of the house. We used Spotted Gum, an Australian hardwood timber for the pergola structure as well as for the privacy screen and bench seats. Basalt volcanic natural stone was used as a paver in a french pattern to perfectly compliment the use of finest grade Spotted Gum Australian hardwood.

GARSWOOD ROAD |
GLENMORE PARK

DURATION –8 Weeks

ARCHITECT – A Cut Above Constructions

PROJECT DETAILS – A rural residence, we designed this area to work in with the new pool and landscaping. Entertainment was the key and with a dining table and lounge area to watch the outdoor TV.

KILLARNEY STREET |
MOSMAN

DURATION – 6 Months

ARCHITECT – Henry Power Architects

PROJECT DETAILS – Ground & First Floor Renovations & Outdoor Entertainment Area

LIZZIE WEBER PLACE |
BIRCHGROVE

DURATION – 3 Months

ARCHITECT – Crayon Pty Ltd

PROJECT DETAILS – On this job in Birchgrove we worked on a rear extension of the home as well as upgrading the kitchen and renovating the backyard.

LONGFORD STREET |
ROSEVILLE

DURATION – 6 Months

ARCHITECT – Adriano Pupilli Architect

PROJECT DETAILS – Ground & First Floor Renovations & Granny Flat Construction & Outdoor Entertainment Areas

MIDDLE HEAD ROAD |
MOSMAN

DURATION – 7 Months

ARCHITECT – The Plan House & Annie Bowen Design

PROJECT DETAILS – Half house renovation with cosmetic changes throughout.

MOLYNEAUX AVENUE |
KINGS LANGLEY

DURATION – 6 Months

ARCHITECT – Private Job

PROJECT DETAILS – Complete House Renovation and Internal Remodelling Including Landscaping & Outdoor Entertainment Area

MORT STREET |
BALMAIN

DURATION – 3 Months

ARCHITECT – Vernon Architects

PROJECT DETAILS – Two Bathroom Renovation at this lovely home in Balmain

OURIMBAH ROAD |
MOSMAN

DURATION – 6 Months

ARCHITECT – Structure Design

PROJECT DETAILS – A complete transformation of this semi-attached dwelling was required to address structural issues and improve on an ageing appearance. Located in one of Sydney’s premier suburbs it needed a renovation to match it’s superb location.

Due to the seriousness of the structural issues of the existing dwelling Grant and his team almost completely re-built the structure from the ground up at the rear of the property. Despite the challenges associated with it’s location on a main road with tight access the renovation delivered a first class designer home with open plan living areas, a modern kitchen and bathrooms and outdoor entertaining areas that would draw the envy of all.

PAMELA PLACE |
KENTHURST

DURATION – 5 Months

ARCHITECT – The ArchiEX Group

PROJECT DETAILS – Ground & Lower Floor Renovation & Outdoor Entertainment Area

PRIMROSE STREET |
QUAKERS HILL

DURATION – 4 Weeks

DESIGN – A Cut Above Constructions

PROJECT DETAILS – A Large house where the clients wanted a large entertaining area for their growing family. The design was attached to the main living areas of the home and give it an indoor / outdoor feel. Complete with a TV and entertainment system unit built into the structure, it is perfect for an afternoon of sport or a BBQ by the pool.

RIDGE STREET |
SURRY HILLS

DURATION – 5 Months

DESIGN – The Plan Workshop

PROJECT DETAILS – A run down terrace in desperate need of a re-vamp, we complexly stripped the terrace adding a 3rd storey. Now a 5 bedroom fresh, sleek designed terrace.

RILEY STREET |
DARLINGHURST

DURATION – 12 Months

DESIGN – Studio May

PROJECT DETAILS – 3 Story Terrace Renovation & Remodel

SPRING STREET |
ABBOTSFORD

DURATION – 2 Months

DESIGN – Private Job

PROJECT DETAILS – Very spacious bathroom renovation in Abbotsford.

TULLOH STREET |
WILLOUGHBY

DURATION

DESIGN

PROJECT DETAILS –